Thursday 16 May 2013


R.A.Y.S

Canon EOS 5D Mark II + Canon EF 17-40mm f/4L USM
1/320 sec ~ f/9 ~ iso 100

This is a picture of transferring oil production operation from FPSO (vessel on the right)  to the export tanker (vessel in the middle). While the small vessel on the left act as a tug boat. She will assist the export tanker in maintaining her position during the whole operation. 

This operation normally lasting for 2 days and at the end of the operation after completed transferring, the export tanker will let go the hose and also the towing hawser. 

The most busiest part during the whole operation is during connecting the export tanker to the FPSO and disconnecting after completed. 

No comments:

Post a Comment